Math Problem Statement
a tunnelling machine drills 400 meters. Estimate the cost of drilling if the first metre cost £1050 and each extra metre cost 110
Solution
Ask a new question for Free
By Image
Drop file here or Click Here to upload
Math Problem Analysis
Mathematical Concepts
Arithmetic
Linear Cost Calculation
Formulas
Total Cost = First Meter Cost + (Number of Additional Meters × Cost Per Additional Meter)
Theorems
-
Suitable Grade Level
Grades 5-7
Related Recommendation
Cost Calculation for Welding Rods for 10-Inch Pipe Weld
Calculating Annual Irrigation Charges: Sinking Fund and Loan Repayment with Compound Interest
Cost of Sheet Steel for a Rectangular Prism Container
Calculate Cost of 300 Steel Bars at R459 per Meter with Discounts
Cost of Plating a Cylinder with Height 10 cm and Radius 4 cm