Math Problem Statement

Blue Ridge wants to decide how many Fast Hot tubs and Speedy Lux hot tubs to produce to maximize total profit. They can only make 200 products. To produce a Fast hot tub, there must be 15 labor hours and 16 feet of tubing To produce a Speedy lux, there must be 12 hours of production and 12 feet of tubing They will earn 300 and 280, respectively, for each product The only hours that are available for the production is 2366, while for the tubing only 3880. Make the model using linear programming:

Solution

Ask a new question for Free

By Image

Drop file here or Click Here to upload

Math Problem Analysis

Mathematical Concepts

Linear Programming
Optimization
Inequalities

Formulas

Objective Function: Maximize Z = 300x1 + 280x2
Production Capacity Constraint: x1 + x2 ≤ 200
Labor Hours Constraint: 15x1 + 12x2 ≤ 2366
Tubing Constraint: 16x1 + 12x2 ≤ 3880
Non-negativity Constraints: x1 ≥ 0, x2 ≥ 0

Theorems

Simplex Method
Feasible Region in Linear Programming

Suitable Grade Level

College Level / Advanced High School