Math Problem Statement
Overhead is applied on the basis of 200% of direct labor cost. The job is charged with $100,000 of materials and 50,000 of manufacturing overhead. What is the total manufacturing cost for the job?
Solution
Ask a new question for Free
By Image
Drop file here or Click Here to upload
Math Problem Analysis
Mathematical Concepts
Algebra
Cost Accounting
Proportions
Formulas
Overhead = 2 * Direct Labor Cost
Total Manufacturing Cost = Materials + Direct Labor + Overhead
Theorems
-
Suitable Grade Level
College-Level (Accounting, Business Studies)
Related Recommendation
Compute Total Manufacturing Cost for Job D-70 and Job C-200
Total Manufacturing Cost Equation Explained: Direct Materials, Labor, and Overhead
Cost Analysis of Manufacturing Company: Calculating Manufacturing and Period Costs
Cost of Goods Manufactured Calculation for Rediger Inc. – June Data
Calculate Total Manufacturing and Unit Product Cost for Job A-500