Math Problem Statement
A foundry produces circular utility access hatches (manhole covers). Currently, 120 covers are produced in a 10-hour shift. If labour productivity can be increased by 20%, it would then be
Solution
Ask a new question for Free
By Image
Drop file here or Click Here to upload
Math Problem Analysis
Mathematical Concepts
Ratios and Proportions
Percentage Increase
Basic Arithmetic
Formulas
Current production rate = Total covers / Total hours
New production rate = Current production rate × (1 + Percentage increase as a decimal)
New total production = New production rate × Total hours
Theorems
None
Suitable Grade Level
Grades 6-8